...to preserve, protect, develop, and restore coastal resources for all Rhode Islanders
Semi-monthly Meeting - Full Council
Coastal Resources Management Council
Narragansett Bay Commission Boardroom
One Service Road, Providence, RI
Tuesday, October 12, 2004
6:00 p.m.
AGENDA
Reading of the minutes of the previous meeting.
Staff Reports.
Subcommittee Reports.
Administrative Applications before the Full Council for Decision:
2004-03-026 CARL DeSIMONE — Construct and maintain: a residential boating facility consisting of a 137.5' x 4' fixed pier. The facility will extend 50' (+/-) beyond mean low water. Also a boat lift will be installed on the north side of the fixed pier. Located at plat N-B, lot 48-26; 19 Searidge Drive, Narragansett, RI.
2004-07-110 THE WESTERLY LAND TRUST — Construct commercial congregate care facility, sixty (60) two-bedroom houses, roadways, and stormwater systems. The development will be serviced by Town water and sewers. Located at plat 140, lot 1; Shore Road, Westerly, RI.
2003-10-006 SETTIPANE FAMILY TRUST — Construct approximately 88-linear feet of "as-built" structural shoreline protection (rip rap revetment). Located at plat 16, lot 11; 301 Seaside Drive, Jamestown, RI.
1995-06-040 NORMAN COOK — Construct modification to an existing residential boating facility to consist of: adding a 4' x 15' fixed pier section and two (2) 4' x 24' fingers (192 square feet) for small boat dockage. The terminus of the dock will extend to 73-feet beyond mean low water (MLW). A 42 square foot float and a 23-foot length variance are required. Located at plat 91, lot 131, 132; 171 Steamboat Avenue, North Kingstown, RI.
Category "A" List