Skip to ContentSitemap

YouTubeFacebookTwittereNewsletter SignUp

CRMC Logo

RI Coastal Resources Management Council

...to preserve, protect, develop, and restore coastal resources for all Rhode Islanders

Semi-Monthly Meeting – Full Council
Monday, July 2, 2007; 6:00 p.m.
Narragansett Bay Commission Boardroom
One Service Road, Providence, RI

AGENDA

Reading of the minutes of the previous meeting
Subcommittee Reports
Staff Reports

Presentation: Marinas Danni Goulet, CRMC

Applications requesting Extension of Assent:

1996-02-044 ROBERT FROST – Project located at plat 13D, lot 324; 15 Read Avenue, Warren, RI.
Applications which have been Out to Notice for 30 days and are before the Full Council for Decision:

2005-12-069 TOWN OF BRISTOL – Construct and maintain transient dockage, additional wave fence and additional permanent dockage at the Church Street Marina. The applicant proposes to construct approx 97 LF of transient dockage and to install approx 108 LF of wave fence. The applicant proposes to install additional float docks that will increase the permanent boat capacity of the marina from 49 to 52 boats. The Marina Perimeter Limit is to be expanded to bound the improvements. Located at plat 10, lot 70, 84; Church Street, Bristol.

2007-02-009 CITY OF NEWPORT – construct and maintain: A public water shuttle facility. To become one stop of the Newport Harbor marine passenger shuttle service. Facility to add to north of existing shuttle facility, and to include a new finger pier (approx 18’ x 20’), two (2) concrete floats (20’ x 55’, and 20’ x 80’), and two (2) ADA compliant ramps. Located at plat 24, lot 348; America’s Cup Avenue, Newport, RI.

1994-09-150 JAMES and REBECCA DURKIN -- to alter the design of a previous authorized residential boating facility, to reflect as-built conditions and to allow for the installation of two tie-off piles as shown on the plans. The current as-built structure for which approval is sought, consist of a 6’ x 110’ fixed timber pier supported by both piles and cribs, a 3’ x 20’ ramp and 8’ x 48’ of terminal floats. The facility extends 126 feet seaward of the cited MLW mark. The two proposed tie-off piles are to be set 22 feet south of the terminal floats. Located at plat Y-1, lots 111, 112, 113; 36 Cedar Island Road, Narragansett, RI.

2002-06-054 ROCCO D’ANGELO – Construct single-family dwelling served by Town water and sewer service. Located at plat N-E, lots 3, 4, 5; Circuit Drive, Narragansett, RI.

Enforcement Report – April and May 2007

Category “A” List

CALENDAR INDEX

Stedman Government Center
Suite 116, 4808 Tower Hill Road, Wakefield, RI 02879-1900
Voice 401-783-3370 • Fax 401-783-2069 • E-Mail cstaff1@crmc.ri.gov

RI SealRI.gov
An Official Rhode Island State Website