...to preserve, protect, develop, and restore coastal resources for all Rhode Islanders
Semi-Monthly Meeting – Full Council
Tuesday, May 27, 2008; 6:00 p.m.
Narragansett Bay Commission Boardroom
One Service Road, Providence, RI
AGENDA
Approval of the minutes of the previous meeting.
Subcommittee Reports.
Staff Reports
Coastal Educational Series – Mark Bullinger, Executive Director and Art Ganz, President, RI Salt Ponds Coalition
Applications which have been Out to Notice for 30 days and are before the Full Council for Decision:
2007-08-042 JUDITH LYTE – Construct and maintain: approximately 50 linear feet of structural shoreline protection. Project is located at plat Y-1, lot 251; 11 Narrows Road, Narragansett, RI.
2008-02-006 COVE HAVEN CORPORATION – Modify an existing Marina Perimeter Limit (MPL) south. There is no increase in the boat count proposed; the modification of the MPL is to accommodate larger vessels. Project is located at 101 Narragansett Avenue, Barrington, RI.
1995-07-232 ARCHES PROPERTY OWNERS ASSOCIATION – Modification of existing Assent by removal of existing 3’ x 10’ fixed pier, 3’ x 10’ ramp and three 4’ x 10’ floats as assented (A1995-07-232). Construct a fixed timber pier 4’ x 65’. The new facility will extend 15’ beyond the existing facility (65’ beyond mean low water). A variance to RICRMP 300.4.E.3(j) is required (the facility is 6’ from the west property line extension and 4’ from the east property line extension, standard distance is 25’). A variance to RICRMP 300.4.E.3(k) is required (proposed length is 65’ beyond mean low water, standard is 50’ beyond mean low water). Located at plat 10, lot 4; 3 Arches Road, Charlestown, RI.
Enforcement Report – April 2008
Category “A” List