...to preserve, protect, develop, and restore coastal resources for all Rhode Islanders
AGENDA
Semi-Monthly Meeting – Full Council
Tuesday, June 28, 2011; 6:00 p.m.
URI Coastal Institute – Hazard Rooms A&
URI Bay Campus; South Ferry Road Narragansett, RI
Approval of the minutes of the previous meeting – June 14, 2011
Subcommittee Reports
Staff Reports
Education Series – Brian Goldman, CRMC Legal Counsel -- CRMC Legal Process
Applications Which Have Been Out-to-Notice for 30 days and are Before the Full Council for Decision:
2010-08-068 SAVE THE BAY/JOHNSON & WALES – Construct and maintain a 14 foot wide by 240 foot long floating wave attenuator; construct a new 8 foot wide by 212 foot long public access fixed pier with a 26 foot square seasonal covered viewing area; construct a kayak dock with two launch ramps and modify the existing Marina Perimeter Limit. The wave attenuator is held in place with 6 mooring blocks and 6 helical anchors; the gangway float is held in place with 2 helical anchors. Located at plat 56, lot 257; 100 Save The Bay Drive, Providence, RI.
2005-08-044 PAYNES NEW HARBOR DOCK INC – Extend/expand existing marina facility as follows: extend main pier 12’ x 80’ northerly to 12’ x 207’ “T” head pier (east-west) with 10’ x 18’ “L” returns at each end. The proposal seeks to add approx. 15 boats to the existing marina boat capacity of 70 +/-. Located at plat 5; Ocean Avenue, New Shoreham, RI.
2011-03-023 WICKBAY PROPERTIES, INC. – Construct and maintain a modified Marina Perimeter Limit and extension of an existing dock (Dock S/M). The modification will not increase the overall boat count due to additional slip modifications within the existing Marina Perimeter Limit. Located at plat 91, lot 142; 65 Reynolds Street, North Kingstown, RI.
Category “A” List