Skip to ContentSitemap

YouTubeFacebookTwittereNewsletter SignUp

CRMC Logo

RI Coastal Resources Management Council

...to preserve, protect, develop, and restore coastal resources for all Rhode Islanders

AGENDA
Semi-Monthly Meeting – Full Council
Tuesday, October 28, 2025; 6:00 p.m.

Administration Building, Conference Room A
One Capitol Hill, Providence, RI

Please click the link below to join the webinar:
https://us02web.zoom.us/j/83539549883?pwd=aInhOShaRRj4w5Ku39O4sC5DXExFZR.1
Webinar ID: 835 3954 9883 Passcode: 734600

Hybrid Meeting Link for Public Viewing Only
All Public Comment Must Be In-Person– Members Must Attend In-Person


1. Approval of the minutes of the previous meeting — October 21, 2025

2. Subcommittee Report

3. Staff Report

4. Applications which have been Out To Notice for 30-Days and are before the Council for Review and Action:

2012-02-074 SHAWN & LISA GUERTIN -- Modification of an approved existing residential boating facility by replacing the terminal float configuration. The permitted float is 7.5’x20’ (150sf). The proposed floats are two (2) 4’x15’, with a hinged 4’x7’ connector (total 148sf, 4’x34.5’overall) extending 64.5’ seaward of the MLW mark, for no increased variance. Project located at Plat 25, Lot 51; 45 Mathewson Road; Barrington, RI.

2025-06-057 DANIEL CROMIE & SUSAN EGAN CROMIE -- Construct and maintain a new residential boating facility consisting of a 4’ x 125’ fixed timber pier, 3’ x 14’ access ramp and 8’ x 18.75’ (150sf) terminal float. The facility is proposed to extend 131’ seaward of the cited MLW mark, requiring an 81’ length variance to Redbook 650-RICR-20-00-01 Section 1.3.1(D)(l)(2); The facility is also proposed within 2’ of the northern property line extension (PLE), requiring a PLE setback variance of 23’ to Section 1.3.1(D)(k). Project located at Plat 82-4, Lot 32; 82C Point Avenue, South Kingstown, RI.

2025-06-026 DEPARTMENT OF ENVIRONMENTAL MANAGEMENT -- Repair existing infrastructure at the former Chase Marina and establish a commercial marina facility. As part of this application, the Marina Perimeter Limit (MPL) has a slight expansion to the west and south in an effort to maintain safe fairway distances and navigation within the facility. New docks and piles would be installed within this MPL. In addition, the applicant proposes filling in tidal waters at an existing derelict marine railway basin to add additional parking spaces in the area. Additional work to be included: installation of a sheet pile bulkhead, repairs to rip rap slopes, construction of timber walkways and docks, and reinforcement of existing granite block walls. Located at Plat 303, Lots 126, 127, 128; 169 Riverside Drive, Tiverton, RI.

5. ADJOURN

 

CALENDAR INDEX

Stedman Government Center
Suite 116, 4808 Tower Hill Road, Wakefield, RI 02879-1900
Voice 401-783-3370 • Fax 401-783-2069 • E-Mail cstaff1@crmc.ri.gov

RI SealRI.gov
An Official Rhode Island State Website