Sitemap Navigation Skip to Content
RI SealOfficial State of Rhode Island Website
YouTubeFacebookXeNewsletter SignUp
CRMC Logo

RI Coastal Resources Management Council

Agenda

Semi-Monthly Meeting — Full Council — Tuesday, June 23, 2026; 6:00 p.m.
Administration Building, Conference Room A, One Capitol Hill, Providence, RI

Join the webinar: LINK — Webinar ID: 896 2720 6386; Passcode: 651812

Hybrid Meeting Link for Public Viewing Only. All Public Comment Must Be In-Person. Members Must Attend In-Person.

 

1. Approval of the minutes of the previous meeting — June 9, 2026

2. Subcommittee Report

3. Staff Report

4. Applications which have been Out To Notice for 30-Days and are before the Council for Review and Action:

2026-01-023 PAWTUCKET REDEVELOPMENT AGENCY -- Construct and maintain:

  1. A vertical slot fishway for restoration of diadromous fish passage from the Seekonk to Blackstone River below the Main Street dam to above the Slater Mill dam
  2. Accessways, overlook and plaza for maintenance and public access, including restoration and enhancement of upland buffer vegetation
  3. Stormwater management improvements
  4. Repair of existing structural shoreline protection (vertical seawall), including removal of 220lf
  5. Work includes excavation, dredging and filling in tidal waters, with 5,000sf of temporary impact, 1700sf of permanent impact, 275cy of dredge material and 385cy of fill
  6. Work includes 2400sf of temporary impact, 815sf of permanent impact, 190cy of dredge material and 105cy of fill within freshwater wetland (Blackstone River). No alterations to vegetated freshwater wetlands are proposed
  7. Variances are required to 650-RICR-2000-01 Section 1.2.1(B)(3)(a)(2)-fill placement and 1.3.1(C)(4)(a)(4)-Structural Perimeter Limit. The project meets the exemption under 1.3.1(J)
  8. The project is exempt from Urban Coastal Greenway requirements of the Metro Bay SAMP Section 5.5(D) and meets several exemptions under FWWC Section 3.2.1 Project Location: Plat 22, lot 287; plat 23, lot 553; 100 Main Street & Broadway, Pawtucket, RI.

5. Application requiring Special Exception before the Council for Public Hearing and Review and Action:

2026-01-056 CITY OF PAWTUCKET -- The second phase of the overall project associated with the Tidewater Stadium Development (Phase 1A). Phase 1B of the Project is a public/private joint development that proposes the following:

6.1.1 VARIANCES – SECTION 1.1.7

The Project is designed to adhere to MB SAMP UCG Sections 5.7(2) and is requesting a Variance for Buffer Zone width. In accordance with this section, the Project is being proposed under Option 2: Variance Request to Reduce Buffer Width.

A portion of the Project is located within the MB SAMP Development Zone. Accordingly, the Project is requesting a variance from the required buffer within this area to adhere to Option 3: Compact UCG Width (50 feet) with compensation for the reduced UCG width.

Work within the MB SAMP Area of Particular Concern (APC) Zone is requesting to be permitted using Option 2: Variance Request to Reduce Buffer Width. A Special Exception is also being requested to allow for reduced buffer widths for segments of the proposed work including 150 LF of public boardwalk, 75 LF of public access path, 200 LF of public nature trail, and site grading associated with the improvements (including the future development on Lot 3).

A variance to applicable design standards of Section 1.3.1(Q) is also requested for the proposed wetland walkover structure crossing a coastal wetland in order to achieve ADA compliance.

6.1.2 SPECIAL EXCEPTIONS – SECTION 1.1.8

The project is seeking two special exceptions to allow for the proposed improvements to be fully implemented as depicted in the plan set and as described in the Application. The first Special Exception is to allow for additional encroachment into Option 2: Variance Reduction 75-foot Buffer within the APC Zone.

The second special exception is to allow the structure to be constructed over a Coastal Wetland and to allow an observation deck to be constructed along the structure.

Project Location: plat 23, lots 599, 672, 673; plat 35A, lot 361; 177 School Street, Pawtucket, RI.

6. Request for Executive Session pursuant to RIGL § 42-46-5 (a)(2):

7. Action on items discussed in Executive Session.

8. ADJOURN

 

Stedman Government Center, Suite 3
4808 Tower Hill Road
Wakefield, RI 02879-1900

Voice: (401) 783-3370
Fax: (401) 783-2069

Office Hours:
Monday – Friday
8:30am – 4:00pm