Semi-Monthly Meeting — Full Council — Tuesday, October 13, 2026; 6:00 p.m.
Administration Building, Conference Room A, One Capitol Hill, Providence, RI

 

In accordance with notice to members of the Rhode Island Coastal Resources Management Council, a meeting was held on Tuesday, October 13, 2026 at 6:00 p.m. located at the Administration Building, Conference Room A, One Capitol Hill, Providence, RI.

Members Present
Stephen Izzi, Vice Chair
Ron Gagnon, RIDEM
Carder Starr
W. Michael Sullivan
Richard Bernardo
Chair Coia

Staff Present
Jeffrey Willis, Executive Director
Laura Miguel, Deputy Director
Rich Lucia, Environmental Engineer IV
Amy Silva, Spv Environmental Scientist
Anthony DeSisto, Legal Counsel
Ryan Moore, IT
Lisa Turner, Recording Secretary

 

1. CALL TO ORDER

Chair Coia called the meeting to order at 6:00 p.m.

2. Review/Action of the Minutes of the Previous Meeting, September 29, 2026

3. Subcommittee Reports

Mr. Willis reported to the Council the following: None

4. Staff Reports

Mr. Willis reported to the Council the following:

5. Applications which have been Out To Notice for 30-Days and are before the Council for Review and Action:

2026-01-003 – NRI TT RGG LLC et al & CITY OF NEWPORT-- The current plan includes conducting maintenance activities along the entire 550-foot length between Webster Street and Narragansett Avenue. For ease of discussion, we have divided the area into 5 sections.

Section 1 (STA 0+00 to 1+25) - Exposed Cliff Face. A geotextile fabric is proposed with crushed stone and rip rap cover. The wall will extend to approximately MLW with a 1.5:1 slope. Grout or concrete will be used to fill existing cavity(s) in the cliff face. Large stones are proposed at the toe, landward of a new cast-in-place concrete block, and armor stones reduced in size past the 100-Year Flood Water Level. Nearly all activities will be above the MLW line.

Section 2 (STA 1+25 to 2+00) - Granite Block Wall. Rip-rap is proposed along the face of the existing granite block wall from the base flood elevation of 25’ NAVD88. Wall construction will be at a 1.5:1 slope. Grout or concrete will be used to fill cavity(s) in the wall face, and/or to create base slope. Large 5’-6’ stones will be placed at the toe, landward of a new cast-in-place concrete block, and armor stones will be placed beyond the 100-Year Flood Water Level. Nearly all activities will be above the MLW line.

Section 3 (STA 2+00 to 3+25) - March 3, 2022, Collapsed Area. A modular stone block wall is proposed directly below and adjacent to the Cliff Walk path. The wall will be supported by concrete filled micropiles drilled 5-feet below bedrock. A rip-rap wall is proposed to extend seaward at a 1.5:1 slope. Grout or concrete will be used to fill cavity(ies) in the cliff face. Large 5’-6’ stones will be placed at the toe, landward of new cast-in-place concrete blocks, and armor stones reduced in size will be placed beyond the 100-Year Flood Water Level. Nearly all activities will be above the MLW line.

Section 4 (STA 3+25 to 4+25) - Exposed Cliff Face. Rip-rap is proposed to extend seaward from the base flood elevation of 25’ NAVD88, sloping at 1.5:1. Grout or concrete will be used to fill cavity(ies) in the cliff face. Large 5’-6’ stones will be placed at the toe in front of new cast-in-place concrete blocks, and armor stones reduced in size will be placed beyond the 100-Year Flood Water Level. Nearly all activities will be above the MLW line.

Section 5 (STA 4+25 to 5+50) – Granite Block Wall. The collapsed area of Section 5, landward of the existing granite block wall is proposed to be filled with crushed stone and topped with a layer of RIDOT R-8 Armor Stone. Seaward of the existing granite block wall, rip-rap is proposed to extend at a slope of 1.5:1. Large 5’-6’ stones will be placed at the toe in front of new cast-in-place concrete blocks, and armor stones reduced in size will be placed beyond the 100-Year Flood Water Level. Nearly all activities will be above the MLW line.

At the location Section F-F (approximately stations 3+75 to 4+25). This portion of the project has been revised to minimize fill within tidal waters by removing the proposed revetment seaward of the rock outcrop (i.e. conglomerate bedrock) Therefore, the work is no longer considered a Prohibited Activity as previously designed. In lieu of filling tidal waters, specifically, the work now includes rock bolting/doweling to the bedrock interface in order to stabilize the upper section of the shale bedrock and glacial till bordering and underlying the existing Cliffwalk. Also, the existing bridge over the Cliffwalk will be shored as necessary by underpinning micro-piles to its base.

The current estimate is that approximately 18,242 square feet (SF) (3830 cubic yards) of permanent impacts will occur in Rhode Island tidal waters (below high tide line).

Chair Coia asked that the Semimonthly Meeting Agenda be made part of the record.

Mr. Lucia addressed the Council and provided background information from July 14, 2026 SMM meeting stating:

CRMC staff did not have objections to a large portion of the project;

CRMC staff did not support the part of the project at the Overlook;

At the July 14th meeting, the Council voted to send the application back to the applicant/ consultant to examine alternatives that would eliminate prohibited activities, which was the filling of tidal waters at that area of 3 plus 75 to 2 plus… 4 plus 50 and to provide to staff an alternative plan for the Overlook area

All parties met on August 5, 2026 to discuss 7 alternatives, and it was agreed that option 7 was the best structurally sound option and also provide the best method of protecting the bridge and overlook at the site. Mr. Lucia stated that this option removed the filling in tidal waters which removed the need for a Special Exception.

Mr. Lucia stated, based on the latest proposal, there there were no staff objections to the revisions, the project meets the policy and standards of the Rhode Island Coastal Resource Management Program; and, therefore, staff recommended approval of the project as revised.

Parties Present for applicant:

Turner Scott, Esq for the Goelet family
Robert Fairbanks, PE for the Goelet family; sworn in and identified himself for the record
Gerard Galvin, Esq for City of Newport

Mr. Scott, Mr. Fairbanks, and Mr. Galvin did not have anything further to add to the record but offered the City Engineers were present if there were questions.

Mr. Bernardo asked about the ownership of the bridge.

Mr. Fairbanks stated that the bridge had always been maintained by the owners of Ochre Court, the Goelet family, are the current owners and will continue to maintain the Overlook/bridge as usual.

Mr. Bernardo asked if stipulation could be added to the Assent for maintenance reports.

Mr. Scott stated that the landowner owns the land to the high tide mark, and they will maintain their property as they have in the past.

Dr. Sullivan asked if the property owner, Goelet, would be taking on the cost of providing greater stability to the bridge. Mr. Scott stated that as it is part of the Cliff Walk project, the City of Newport would take on the cost.

Atty Galvin confirmed that there is a federal grant to restore the cliff walk and these actions are necessary to improve the cliff walk.

No further questions.

No public comments

Motion:

Mr. Izzi motioned for the application to be approved based on the CRMC Staff Report and prepared testimony; testimony of Mr. Fairbanks and collectively of the other attendees. Mr. Izzi agreed to add standard stipulations as well as both CRMC Staff reports: the initial report and amended report.

Second by Mr. Starr.

Ownership discussion regarding the maintenance of the overlook.

Chair Coia did a roll call vote:
Mr. Starr Aye
Mr. Izzi Aye
Mr. Sullivan Aye
Mr. Bernardo Aye
Mr. Gagnon Aye
Chair Coia Aye

Motion carried unanimously.

9. ADJOURN

A motion to adjourn was made and seconded.

Motion to adjourn approved on a unanimous voice vote. The meeting was adjourned at 6:25 pm.

 

Minutes respectfully submitted,
Lisa A. Turner, Recording Secretary

 