Skip to ContentSitemap

YouTubeFacebookTwittereNewsletter SignUp

CRMC Logo

RI Coastal Resources Management Council

...to preserve, protect, develop, and restore coastal resources for all Rhode Islanders

AGENDA
Semi-Monthly Meeting – Full Council
Tuesday ,May 28, 2013; 6:00 p.m.
Conference Room A, Administration Building,
One Capitol Hill, Providence, RI

Approval of the minutes of the previous meeting: May 14, 2013
Subcommittee Reports
Staff Reports

Education Series: Wenley Ferguson - Restoration Coordinator, Save The Bay: Assessing the effects of sea level rise on salt marsh ecosystems

Full Council Review of Ocean SAMP Subcommittee’s Recommendation to Deny Motions to Intervene:

2012-09-065 DEEPWATER WIND OF RI, LLC

Application which have had Public Hearings and are Before the Full Council for Final Decision:

2013-03-046 CITY OF PAWTUCKET – Improvements to public boat launch facility consisting of new ramp, floating boat dockage and timber boardwalk per plans submitted to CRMC. Located at plat 23A, lot 673; plat 35A, lot 361; “Festival Pier” Tim Healey Way, Pawtucket, RI.

2013-02-060 DEPARTMENT OF ENVIRONMENTAL MANAGEMENT – The demolition of the existing boat ramp, construction of a new doublewide ramp with associated floats. The project will include dredging to support the new ramp layout and depths with the material being used on a nearby State beach that needs sand at the time of the project. Located at plat I-G, lot 96; State Boat Ramp, Great Island Road, Narragansett..

Application Requiring Special Exception before the Full Council for Decision:

2013-03-216 DEPARTMENT OF ENVIRONMENTAL MANAGEMENT -- Construct and maintain a public boating access ramp. Work includes improvements to access road by widening to 24’, placement of riprap on the side slopes, and an innovative living shoreline technique will be used on the north cove consisting of salt marsh plantings through a biodegradable erosion control blanket protected by a biodegradable coir log set at mean sea level. Approximately 6,000 square feet of salt marsh will be restored/created by this project. Project will require the dredging of 500 cubic yards of material. All suitable material will be used for roadway construction. The dredging will require a Special Exception (reference RICRMP Section 130) to a Prohibited Activity. Located at plat 8, lot 3, Gull Cove Fishing Area, Portsmouth, RI.

CALENDAR INDEX

Stedman Government Center
Suite 116, 4808 Tower Hill Road, Wakefield, RI 02879-1900
Voice 401-783-3370 • Fax 401-783-2069 • E-Mail cstaff1@crmc.ri.gov

RI SealRI.gov
An Official Rhode Island State Website