AGENDA
Semi-Monthly Meeting – Full Council
Tuesday, August 27, 2013; 6:00 p.m.
Conference Room A, Administration Building
One Capitol Hill, Providence, RI
Subcommittee Reports
Staff Reports
Approval of the minutes of the previous meeting: July 30, 2013
Applications which have been Out-To-Notice for 30 Days and are before the Full Council for Decision:
2013-03-063 BLOUNT BOATS, INC – Installation of a 150 foot long fabric covered steel framed structure in the Blount Boats yard. The purpose is to provide cover for vessels and workers from inclement weather and also contain by-products from vessel blasting and painting. Located at plat 6, lot 11; 461 Water Street, Warren, RI.
2013-05-036 DEPARTMENT OF ENVIRONMENTAL MANAGEMENT – New dredging of approximately 10,300 CY of material from within the limits of the Alofsin Pier and continuing north approximately 300 feet. The dredging is proposed to be performed mechanically to a depth of -18’MLW with disposal of the material into the CAD cells. The work is proposed to be performed within the normal dredge window and avoids all mapped sub-aquatic vegetation. Located at plat 47, lot 2; Fort Adams State Park – Alofsin Pier, Newport, RI.
2013-05-221 DEPARTMENT OF ENVIRONMENTAL MANAGEMENT – Construct and maintain: a new fixed pier that is approximately 240’ long by 24’ wide with a wave fence incorporated into the pier. The facility will also have a 210’ long x 12’ wide concrete floating dock running parallel to the main dock on the south side which is capable of supporting finger piers as shown on the submitted plans. Located at plat 47, lot 2; Fort Adams State Park, Newport, RI.