Skip to ContentSitemap

YouTubeFacebookTwittereNewsletter SignUp

CRMC Logo

RI Coastal Resources Management Council

...to preserve, protect, develop, and restore coastal resources for all Rhode Islanders

AGENDA
Semi-Monthly Meeting – Full Council
Tuesday, May 9, 2023; 5:00 p.m.

Administration Building, Conference Room A
One Capitol Hill, Providence, RI

Please click the link below to join the webinar:
https://us02web.zoom.us/j/84220045219?pwd=TjZIbk1WRHJmSmFPTnBDSm1BWGlCQT09
Webinar ID: 842 2004 5219; Passcode: 830684
Or Telephone:
833 548 0282 US Toll Free; 877 853 5247 US Toll Free; 888 788 0099 US Toll Free; 833 548 0276 US Toll Free
Webinar ID: 842 2004 5219; Passcode: 830684

Hybrid Meeting Link for Public Viewing Only-
All Public Comment Must Be In-Person– Members Must Attend In-Person


Subcommittee Reports/Staff Reports

Applications that have been Out to Public Notice before the Council for Review and Action:

2022-09-020 NEW YORK YACHT CLUB -- An existing recreational facility is proposed to be modified and expanded to consist of a 16’ x 136’ concrete floating dock, 16’ x 198’ floating concrete wave attenuators, 10’ x 132’ race committee floating dock, and a 10’ x 122’ floating dinghy dock which extends from an existing concrete wharf. The facility is proposed to extend 160ft beyond mean low water (MLW). Located at plat 41, lot 12; 5 Halidon Avenue, Newport, RI.

1994-11-030 TOWN OF PORTSMOUTH - Modify original Assent (1994-11-030) in order to complete repairs and replace public boat launch facility. Work includes removing the original northern upper and lower fixed pier and replacing with a new single fixed pier. Also, a new pre-cast reinforced concrete boat ramp, floating docks and a stone protection structure (groin) will be installed.

The boat ramp will feature a timber groundout floating dock system. The existing 8 timber piles to the southwest of the boat ramp will be removed and replace by 7 steel piles to support the float system. The float system will have a deck 6 feet wide and will consist of three (3) 20-foot sections and one (1) 24-foot section. The float system will be preceded with a reinforced concrete abutment, approximately 20 feet long by 6 feet wide at the shoreline.

Additionally, to protect against wave action a stone protection structure (groin) will extend from the edge of the existing riprap revetment, to the southwest of the boat ramp. The protection structure will have a varying base width (47 feet maximum) and taper s from the base to a width of 4 feet at the crest. The quantity of fill below MHW is 18500 cf. Located at 0 Burma Road, Portsmouth, RI – plat 50, lot 7

Continuation from Tuesday, April 25th, 2023:

Discussion and action on federal consistency decision for CRMC File 2021-06-029 Revolution Wind, LLC Coastal Zone Management Act consistency certification; offshore wind energy facility in federal waters.

 

CALENDAR INDEX

Stedman Government Center
Suite 116, 4808 Tower Hill Road, Wakefield, RI 02879-1900
Voice 401-783-3370 • Fax 401-783-2069 • E-Mail cstaff1@crmc.ri.gov

RI SealRI.gov
An Official Rhode Island State Website